Double-Head Hydraulic Shear

Double-Head Hydraulic Shear

original price: 10 000 USD
Jiangying, China
Production capacity:
50 Set / Month
Jiangying, China
Company
86-0510-86222407
Yoko Fong
Contact person

Basic Information

Double-column Shearing Machine for Pipe Production Line: The Technological Process:Moving coil→setting coil→uncoiling→shearing and butt welding→horizontally guiding→feeding→storing→discharging(electric control system and hydraulic system)→forming→welding→sizing→flying saw→run out table on the roll way.TheDescription of Product:1.Shearing machine is the main assistant equipment in the welded pipe production line.2. It is used to cut the irregular part of the steel strip head and end, and butt weld them, to ensure the continously production of the welded pipe procution line.3. YJ600 double-column shearing machine is the product of JIANGYIN YINJIANG MACHINERY CO., LTD. It is suit for the steel strip, which width:≤580mm,thickness:≤6.0mm.4. The brief of YJ series hydraulic shearing machineA. The shearing machine use the hydraulic system to control the shear stress, to meet the requirements of cutting off the strip, and play the part of shearing in the strip production line. It is the necessary equipment to ensure the formation of the cut surface of strip. In the production process, during replacing the coil, it can cut the head and tail of the strip quickly, to make the cut surface meet the requirements of the butt welding, and keep the strip leveling.B. The main technical parameters of YJ series hydraulic shearing machineThe parameters of the main function:1Blade length: 400--8502Strip thickness: 0.5--83The maximum width of strip: 8004The largest area: length 3M×width 1MThe power parameters:Configurate in accordance with the strip width and thickness, take the power configurations of 480 hydraulic shearing machine for example:1Strip width≤450, thickness≤3, with 2.2Kw motor2Strip width≤450, thickness≤4, with 4Kw motorThe hydraulic system:Tank: φ125×190--16MPaTank : φ70×930----16MpaTank : φ50×25------16MpaC. The component and functionNo.NameFunction1Hydraulic stationProvide power source for the shear.2The main part of shearingCut off the strip, keep the cut surface of strip leveling.3Welding platformCompress the head and tail of the strip with the pressure plate, align the cut surface, convenient to welding.4BaseProvide the fixed and the mobile. The mobiles shearing machine will be removed in the case of shearing machine not working, so that it does not affect the normal movement of strip.5The controling partControl the use of shearing and pressure plate.D. The working process of YJ series hydraulic shearing machineThe process of hydraulic shearing machine is divided into three stages:(a)Crop front-end: Hang the full coil on the uncoiler, draw out the front-end, put it on the knife-edge, keep the center of the strip and the blade in line, cut the irregular side of the front-end of the strip to normal standard.(b)Crop back-end: When a full coil is about to transmit to the end, put the back-end on the knife-edge of the shearing machine, keep the center of the strip and the blade in line, cut the irregular side of the back-end of the strip to normal standard.(c)Butt welding: After cutting the back-end of the strip, put it on the welding platform, press it with the pressure plate,and after cutting the front-end of the strip, put it on the welding platform, press it with the pressure plate, align the strip and ensure the cut surface next. Then use the argon welder to weld, the seam must be full-welding and complete penetration. And ensure the quality of welding, In order to not to impact normal production. Release the two pressure plate after completing the welding, then start the moving button so that the shearing machine can move away.The model and basic parameters:No.Product NameModelStripWidth (mm)Strip Thickness(mm)1Shearing & Butt Welding MachineYJ480≤420≤3YJ550≤520≤32Shearing MachineSimple≤500≤3YJ600 Double-column≤580≤6YJ800 Double-column≤780≤8YJ850 Double-column≤830≤9RemarksWe can design according to the customer's demand, pleas feel free to contact us if you have any questions!

Delivery terms and packaging

Packaging Detail: Bare packing ,or according to customer's request. Delivery Detail: Within one week after receiving deposit.
Port: SHANGHAI

Payment term

Letter of credit

Telegraphic transfer

MoneyGram

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product